The test, carried out on June 24 at the ISRO Propulsion Complex, demonstrated stable operation of the engine’s power head at a thrust level of 175 tons
Source: Bloomberg
27. June 2026 09:14
The test, carried out on June 24 at the ISRO Propulsion Complex, demonstrated stable operation of the engine’s power head at a thrust level of 175 tons
Source: Bloomberg